pisco_log
banner

Common Problems and Countermeasures of Quality Management in Water Conservancy Project Construction

Xiang Li, Chenguang Ma

Abstract


As a vital component of the national economy, water conservancy projects play a crucial role in delivering engineering benefits,
ensuring operational safety, and maintaining social stability. However, in the actual construction process, quality management is frequently
challenged by multiple factors, leading to various issues that hinder the overall improvement of project standards. By thoroughly analyzing
the common problems in quality management throughout water conservancy constructionparticularly in aspects such as contractor management, design process control, and supervision mechanismsexisting deficiencies can be identified. On this basis, practical and targeted improvement strategies are proposed.

Keywords


Water Conservancy Projects; Quality Management; Construction Management

Full Text:

PDF

Included Database


References


[1] Deng Y, Lyu Z Lei J, et al. Research on development model and countermeasures of whole basin water conservancy scenic area in the

Yongding River[J]. Journal of Economics of Water Resources, 2024, 42(6):8-13.

[2] Fan Z, Xu W, Liu D. Difficulties and Countermeasures in the Construction Technology of Long Distance Undercrossing of Lakes with

Pipe Jacking in Complex Strata[C]//International Conference on SmartRail, Traffic and Transportation Engineering. Springer, Singapore, 2024.

[3] Ning Z, Zhiyuan B, Liguo Z, et al. Study on the Influence and Countermeasures of the Canal Projects on Aquatic Ecological Environment of Rivers along the Line[J]. E3S Web of Conferences, 2023, 393(000):5.




DOI: http://dx.doi.org/10.70711/hepr.v2i2.7154

Refbacks

  • There are currently no refbacks.